Skip to main content
COWORKING - Mumbai

9-Floor BKC Tower - CommScope Cat6A Backbone

Corporate HQ (BKC)

9

floors

1850

drops

240000

sqft

Stack
Share

Live deployment footage — Corporate HQ (BKC), Mumbai

(01)

Challenge

What was broken._

A flagship corporate tenant moving into a new BKC tower needed a 25-year structured-cabling backbone with documented topology, fibre risers between floors, and zero downtime during the staged occupancy across nine floors.

(02)

Solution

What we did._

CommScope Systimax GigaSPEED X10D Cat6A across all data drops, TeraSPEED OS2 fibre risers floor-to-floor, Imvision modular patch panels in each floor IDF, and a full as-built topology map registered for the Systimax 25-year warranty programme.

Products deployed

Systimax GigaSPEED X10D Cat6ATeraSPEED OS2 fibreImvision panels

(03)

Results

The outcomes, measured._

  • 1,850 Cat6A drops certified to channel performance
  • 25-year Systimax system warranty registered
  • Staged occupancy completed across 9 floors with zero rework
The cabling story was the only thing our auditors didn't have notes on. That's the highest compliment.

Head of Workplace Tech - Corporate HQ, BKC

Want a similar outcome?_

Browse more cases