Live deployment footage — Corporate HQ (BKC), Mumbai
(01)
Challenge
What was broken._
A flagship corporate tenant moving into a new BKC tower needed a 25-year structured-cabling backbone with documented topology, fibre risers between floors, and zero downtime during the staged occupancy across nine floors.
(02)
Solution
What we did._
CommScope Systimax GigaSPEED X10D Cat6A across all data drops, TeraSPEED OS2 fibre risers floor-to-floor, Imvision modular patch panels in each floor IDF, and a full as-built topology map registered for the Systimax 25-year warranty programme.
Products deployed
Systimax GigaSPEED X10D Cat6ATeraSPEED OS2 fibreImvision panels
(03)
Results
The outcomes, measured._
- 1,850 Cat6A drops certified to channel performance
- 25-year Systimax system warranty registered
- Staged occupancy completed across 9 floors with zero rework
“The cabling story was the only thing our auditors didn't have notes on. That's the highest compliment.”
Head of Workplace Tech - Corporate HQ, BKC