Case Studies / warehousing
WAREHOUSING - Bhiwandi6-Warehouse Cluster Rolls Out Seamless Roaming
3PL Logistics Operator
800+ scanners
users
180
aps
950000
sqft
(01)
Challenge
What was broken._
Scanners dropped every 12 minutes across high-racking zones. Pick productivity fell 22%.
(02)
Solution
What we did._
Industrial IP67 APs, predictive high-rack modeling, 802.11r fast-roaming, PoE++ backbone.
Products deployed
Ruijie RG-RAP6262(G)TL-SG3452XP switches
(03)
Results
The outcomes, measured._
- Scanner drops reduced to <1 per shift
- Pick productivity recovered 28% above baseline
- ROI achieved in 7 months
“The only people happier than our pickers are our ops managers.”
Head of Operations - 3PL Operator